Skip to content
Dossier

500BlogForecasting

B-028

Forecasting with twelve deals

Stage probabilities need hundreds of deals before they mean anything. With twelve, use three piles, a range instead of a number, and one named risk per deal.

Call no.
B-028
Filed under
Forecasting
Author
Nora Vasquez, Co-founder, CEO
Date
Reading time
3 minutes

Forecasting advice assumes hundreds of deals: conversion rates by stage, cohorts, regressions. A small team has twelve open deals. With twelve, “proposal means 50%” is a superstition. It does not mean six will close. It may mean the two large ones do not.

Small numbers do not average out

A weighted pipeline works when there are enough deals for the errors to cancel. With twelve they do not. In the sample pipeline on our home page, Northgate Analytics is a $54,000 deal at the proposal stage, 30% of everything open. Weighted, it adds $27,000 to the forecast. That number will never arrive. The deal lands as $54,000 or as zero.

Three piles, not one number

  1. Commit. A verbal yes, paperwork moving, a date the buyer set. You would be surprised to lose it.
  2. Likely. The buyer acted in the past week, the next step has a date, and you know who signs. More likely than not.
  3. Possible. Everything else that is open and not stale.

Then report a range. Commit is the floor. Commit plus Likely is the number you plan around. All three together are the ceiling, and nobody should spend the ceiling.

A deal changes pile only when something happens on the buyer’s side: a reply, a meeting they accepted, a document they sent. Your own good mood after a call is not an event. If nothing happened this week, the deal stays where it was.

PileDealsValueRunning totalUse it as
Commit2$18,000$18,000The floor
Likely4$71,500$89,500The plan
Possible6$96,400$185,900The ceiling
Twelve deals in three piles. The forecast is “$18k to $186k, planning on $89k”.
Commit

$18,000

Deals
2
Total
$18,000, the floor

You would be surprised to lose these.

Likely

$71,500

Deals
4
Total
$89,500, the plan

Active this week, dated next step.

Plan on this
Possible

$96,400

Deals
6
Total
$185,900, the ceiling

Open and not stale. Do not spend it.

The piles as cards. Move a deal between them only when the buyer does something.

Name one risk per deal

With twelve deals you can do something a large team cannot: know each one. For every Likely deal, write the single thing most likely to kill it. Procurement has not seen the quote. Our champion goes on leave on the 12th. A risk with a name is one you can act on this week. A probability is not. Give each risk an owner and a date to check it, exactly as you would a next step.

With twelve deals, a forecast is a list of twelve opinions. Make them good opinions.

Score yourself

On the first of each month, write down the range. On the last day, write what closed. After six months you know your own bias, and it is nearly always the same one: most people are about 20% optimistic about Likely. That single correction is worth more than a model.

The big-deal problem

If one deal is more than a quarter of your pipeline, forecast twice: with it and without it. Give both numbers to whoever depends on them, whether that is a co-founder or a bookkeeper. Planning payroll around half of a deal that will arrive whole or not at all is how small companies get into trouble. Say which version the plan is built on, and change it only when the big deal changes pile, not when its champion sounds cheerful.

Before any of this, the piles need honest inputs. Reading the pipeline honestly comes first: a stale deal does not belong in any pile.

B-028Filed 16 Sep 2026by Nora Vasquez

720 · New workspace

Start with the cards you already have.

Connect an inbox and Dossier files the last 90 days of conversations into cards. The median team has its first full card in four minutes.

Or talk to someone first

What happens next

  1. Connect Gmail or Outlook

    Read-only. You choose which labels and folders count.
  2. Cards fill themselves in

    People, companies and deals from the last 90 days.
  3. Invite two teammates

    Three seats are free for as long as you like.